When the Yangtze River Bridge was not built more than 60 years ago, the Beijing-Guangzhou Railway was divided into two sections called the Beijing-Han Railway and the Han-Guangzhou Railway. From this place, the train is driven to the ship, transported to Wuchang on the other side of the Yangtze River, and then started to set off.